RENOMA
  • pl
  • en
  • CHOOSE YOUR SECTOR

    The content in the manual will adjust to the specific
    location of your workplace.

  • pl
  • en
  • Choose the sector you work in:

    GENERAL TIPS

    Below we present issues related to the premises use rules. If you can’t find something, let us know or have a look at your contract.


    Pro tip

    Please note that, due to the historical nature of the facility, certain changes will require approval from the conservator of monuments and a permit for construction work.


    WHAT CAN BE CHANGED IN YOUR OFFICE?

    If you relocate to another facility, the office should be restored to its original state. Any modifications should be able to be reversed.

    Without special permission, you are allowed to:

    Hang posters, pictures, signs, TVs on the walls (as long as they are not visible from the outside).

    With a special permission, you are allowed to:

    Place stickers on glass doors.

    Install hanging decorations.

    Replace roller shutters. However, they must be the same model throughout the building.

    Paint walls and lay structural plaster, etc.

    Make changes to flooring.

    Make changes regarding floor outlets.

    Make changes to intercom.

    Make changes to existing office equipment.

    Make changes that cannot be undone prior to moving out.

    Make changes that are not necessary for the functionality of a given room.

    WHAT CANNOT BE DONE

    You cannot make any changes to windows or other elements of the leased space without written permission. This is especially true if the property manager objects to these changes.

    Premises renovation

    A little renovation? No problem! Still, you need to get the property manager’s and technical manager’s approval first.

    There is a special procedure for carrying out construction work, including renovations and alterations, in the building. The most important requirements are listed below. Please read the full information in the document attached to the lease agreement: “Contractor’s regulations”.

    DESIGN CHANGES STEP BY STEP

    STEP 1

    Before starting the work, the contractor must obtain a permit. This will be issued by the manager of the Renoma Shopping Centre on the basis of a notification form.


    STEP 2

    In order to obtain a permit for the work, the contractor must submit the following information:

    • the expected scope of the dangerous work,
    • the method of securing the work area,
    • the method of ensuring that the face of the work is kept aesthetically pleasing,
    • the method of delivery of materials,
    • the method of waste disposal,
    • the third party liability insurance issued to the principal or the contractor,
    • the work schedule.

    STEP 3

    When carrying out work at Renoma, the contractor is required to comply with a number of regulations, including occupational health and safety, fire safety and adequate security of the work. Failure to do so will result in suspension of the works until the cause of the breach is rectified.


    STEP 4

    On completion of the works, the contractor shall immediately restore the area adjacent to the site to its condition prior to the commencement of the works.


    STEP 5

    All construction works shall be carried out in accordance with the following rules:

    • The timing of noisy and disruptive works must be agreed with the building manager; this is usually after the opening hours of the complex or at weekends.
    • Escape routes, passages, staircases, vestibules and corridors must not be blocked.
    • The building site must have its own rubbish container and rubbish may be disposed of only there; the location of the container must be agreed with the manager, taking into account both the convenience of the building team and the comfort of the building users.
    • Persons carrying out the work should not use lifts and should only use staircases; walls, stairs and handrails should be protected from mechanical damage when transporting materials.

    Notification forms

    Not sure how to complete the notification form? Here’s a little cheat sheet.


    Pro tip

    You can report your works using the notification form. But that is not the only way! You can also use the Singu app. Here is a tip on how to do this.


    DESIGN CHANGES STEP BY STEP

    STEP 1

    Before starting the work, the contractor must obtain a permit. This will be issued by the manager of the Renoma Shopping Centre on the basis of a notification via the Singu app.


    STEP 2

    In order to obtain a permit for the work, the contractor must submit the following information:

    • the expected scope of the dangerous work,
    • the method of securing the work area,
    • the method of ensuring that the face of the work is kept aesthetically pleasing,
    • the method of delivery of materials,
    • the method of waste disposal,
    • the third party liability insurance issued to the principal or the contractor,
    • the work schedule.

    STEP 3

    When carrying out work at Renoma, the contractor is required to comply with a number of regulations, including occupational health and safety, fire safety and adequate security of the work. Failure to do so will result in suspension of the works until the cause of the breach is rectified.


    STEP 4

    On completion of the works, the contractor shall immediately restore the area adjacent to the site to its condition prior to the commencement of the works.


    STEP 5

    All construction works shall be carried out in accordance with the following rules:

    • The timing of noisy and disruptive works must be agreed with the building manager; this is usually after the opening hours of the complex or at weekends.
    • Escape routes, passages, staircases, vestibules and corridors must not be blocked.
    • The building site must have its own rubbish container and rubbish may be disposed of only there; the location of the container must be agreed with the manager, taking into account both the convenience of the building team and the comfort of the building users.
    • Persons carrying out the work should not use lifts and should only use staircases; walls, stairs and handrails should be protected from mechanical damage when transporting materials.

    Pro tip

    Not sure how to complete your notification in Singu? Here’s a little cheat sheet.


    Common areas

    Freedom in your own home!. Still, not where employees of different companies meet. Apart from the examples given in the branding section, you must not display any signs, information, flags, posters, adverts etc. in common areas. This applies to windows, doors, corridors and other shared parts of the building unless you are given special permission. To get it, make sure that everything you want to put in common areas is unobtrusive and fits in with the surroundings.


    Contact us

    Do you wish to know more, or maybe need some help? Our team is waiting for you! Below you will find contact information about matters relating to this section.

    Aneta
    Jarych-Szumowska

    Senior Property Manager
    Aneta Jarych-Szumowska
    +48 605 110 531

    You can contact her about almost anything. She will help you with both financial and administrative matters. In particular, she will be the person who draws up a lease, issues an invoice, settles the utility bills or provides you with details of the building’s maintenance. She also co-ordinates marketing, advertising signage, short-term leases and event organisation.

    Access control
    Advertising signage
    ARRANGEMENT CHANGES DURING THE LEASE TERM
    Events
    Lease contract
    Moving
    Notifications
    Property manger
    Renovations

    Mateusz
    Magdoń

    Technical Manager
    Mateusz Magdoń
    +48 664 900 697

    Responsible for coordinating the repair of faults in the building. Answers questions about technical issues in the rented premises and gives permission for technical changes to the premises.

    Access control
    Air conditioning
    ARRANGEMENT CHANGES DURING THE LEASE TERM
    Electric chargers
    Faults
    Fire safety
    Internet
    Moving
    New technologies
    Notifications
    Renovations
    Telecommunications infrastructure

    Przemysław
    Sus

    Project Manager
    Przemysław Sus
    +48 605 495 311

    If you want to refresh your office or change its layout, he’s the one to talk to.

    ARRANGEMENT CHANGES DURING THE LEASE TERM
    Renovations

    Piotr
    Smardz

    Fire protection appraiser
    Piotr Smardz
    +48 507 794 866

    Monitors the state of fire safety, including providing opinions on the design alteration concepts in the scope of fire safety, carrying out routine fire inspections ordered by the building manager and preparing fire safety instructions.

    ARRANGEMENT CHANGES DURING THE LEASE TERM
    Fire safety
    Renovations